Site Allocations Plan March 2016

List Comments

Search for Comments

Response Type
Order By
in order

70 comments.

List of comments
RespondentResponse DateDetails
North Somerset Flood Risk Mana… 26 Apr 2016

Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Weston-super-Mare Former Bournville School Site, Sellworthy Road

  • Comment ID: 14550881//52
Having looked at the site from an ordinary watercourse, surface water and ground water flooding point of view we have the following comments: Drainage Category 2 - The site could be drained by sustainable drainage, however there are constraints and these need to be considered in the design Reason – Uphill Great Rhyne adjacent to the site The subsurface is potentially suitable for infiltration SuDS although the design will be influenced by the ground conditions.
North Somerset Flood Risk Mana… 26 Apr 2016

Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Weston-super-Mare Station Approach *

  • Comment ID: 14550881//54
Having looked at the site from an ordinary watercourse, surface water and ground water flooding point of view we have the following comments: Drainage Category 1 - Easily drained and sustainable drainage could be implemented easily Reason – Opportunities for bespoke infiltration SuDS
North Somerset Flood Risk Mana… 26 Apr 2016

Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Nailsea Land at West End

  • Comment ID: 14550881//62
Having looked at the site from an ordinary watercourse, surface water and ground water flooding point of view we have the following comments: Drainage Category 2 - The site could be drained by sustainable drainage, however there are constraints and these need to be considered in the design Reason – Groundwater Vulnerability, Susceptible to groundwater flooding
North Somerset Flood Risk Mana… 26 Apr 2016

Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Service Villages Land to the east and west of Wemberham Lane, Yatton

  • Comment ID: 14550881//70
Having looked at the site from an ordinary watercourse, surface water and ground water flooding point of view we have the following comments: Drainage Category 3 - Sites which will not drain easily and therefore might not be viable as they would require pumping Reason – Known flooding and constraints for conveyance. Pumping would be required
North Somerset Flood Risk Mana… 26 Apr 2016

Site Allocations Plan March 2016 Schedule 2: Proposed Employment Sites Portishead Portishead: Proposed Employment Sites

  • Comment ID: 14550881//77
Conference Avenue (Marine View / Portishead Quays?) - Having looked at the site from an ordinary watercourse, surface water and ground water flooding point of view we have the following comments: Drainage Category 1 - Easily drained and sustainable drainage could be implemented easily Reason - Highly variable permeability. Infiltration/soakaway test required and consider whether infiltration can be used as a SuDS technique alongside water storage (in ponds/chambers) and re-use.
North Somerset Flood Risk Mana… 26 Apr 2016

Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Weston-super-Mare Land to the west of Winterstoke Road*

  • Comment ID: 14550881//78
Employment element - Having looked at the site from an ordinary watercourse, surface water and ground water flooding point of view we have the following comments: Drainage Category 1 - Easily drained and sustainable drainage could be implemented easily Reason - Highly variable permeability. Infiltration/soakaway test required and consider whether infiltration can be used as a SuDS technique alongside water storage (in ponds/chambers) and re-use.
North Somerset Flood Risk Mana… 26 Apr 2016

Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Weston-super-Mare South of Herluin Way, Avoncrest Site*

  • Comment ID: 14550881//84
Employment element - Having looked at the site from an ordinary watercourse, surface water and ground water flooding point of view we have the following comments: Drainage Category 1 - Easily drained and sustainable drainage could be implemented easily Reason - Main river culvert under the site and ordinary watercourse culvert. Opportunities for bespoke infiltration SuDS
North Somerset Flood Risk Mana… 26 Apr 2016

Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Service Villages Moor Lane, Backwell

  • Comment ID: 14550881//89
Employment element - Having looked at the site from an ordinary watercourse, surface water and ground water flooding point of view we have the following comments: Drainage Category 2 - The site could be drained by sustainable drainage, however there are constraints and these need to be considered in the design Reason – Susceptible to groundwater flooding. Opportunities for bespoke infiltration SuDS
North Somerset Flood Risk Mana… 26 Apr 2016

Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Weston-super-Mare Scot Elm Drive

  • Comment ID: 14550881//31
Having looked at the site from an ordinary watercourse, surface water and ground water flooding point of view we have the following comments: Drainage Category 1 - Easily drained and sustainable drainage could be implemented easily Reason - Opportunities for bespoke infiltration SuDS
North Somerset Flood Risk Mana… 26 Apr 2016

Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Weston-super-Mare Gas Works, Winterstoke Road

  • Comment ID: 14550881//38
Having looked at the site from an ordinary watercourse, surface water and ground water flooding point of view we have the following comments: Drainage Category 2 - The site could be drained by sustainable drainage, however there are constraints and these need to be considered in the design Reason - areas of 1 in 30 surface water risk - infiltration/soakaway test required and consider whether infiltration can be used as a SuDS technique alongside water storage (in ponds/chambers) and re-use
Next pageLast page