Site Allocations Plan March 2016

List Comments

Search for Comments

Order By
in order

5 comments.

List of comments
RespondentResponse DateDetails
Coal Authority 14 Jun 2016

Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Service Villages Moor Lane, Backwell

  • Comment ID: 928833//5
The site specific details and notes for the site indicate that it falls within The Coal Authority Development High Risk Area and a Coal Mining Risk Assessment will be required
Environment Agency 28 Apr 2016

Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Service Villages Moor Lane, Backwell

  • Comment ID: 1020673//27
Area should be surveyed at an appropriate time, prior to work beginning, for water voles, by a qualified ecologist. If evidence is found, advice on how to proceed must be sought from the ecologist. Deciduous woodland – dormice: breeding season for dormice is May - late Oct. These sites are adjacent to the Axe and Somerset Streams SSSI. Natural England must be consulted if the streams will be affected.
North Somerset Levels IDB 28 Apr 2016

Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Service Villages Moor Lane, Backwell

  • Comment ID: 11734177//71
NSLIDB see detailed comments
North Somerset Flood Risk Mana… 26 Apr 2016

Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Service Villages Moor Lane, Backwell

  • Comment ID: 14550881//89
Employment element - Having looked at the site from an ordinary watercourse, surface water and ground water flooding point of view we have the following comments: Drainage Category 2 - The site could be drained by sustainable drainage, however there are constraints and these need to be considered in the design Reason – Susceptible to groundwater flooding. Opportunities for bespoke infiltration SuDS
North Somerset Flood Risk Mana… 26 Apr 2016

Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Service Villages Moor Lane, Backwell

  • Comment ID: 14550881//43
Having looked at the site from an ordinary watercourse, surface water and ground water flooding point of view we have the following comments: Drainage Category 1 - Easily drained and sustainable drainage could be implemented easily Reason – Opportunities for bespoke infiltration SuDS