Site Allocations Plan March 2016
List Comments
3 comments.
Respondent | Response Date | Details |
---|---|---|
North Somerset Levels IDB | 28 Apr 2016 | Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Nailsea Land at West End
NSLIDB see detailed comments
|
Nailsea Action Group | 27 Apr 2016 | Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Nailsea Land at West End
Nailsea Action Group comment on Land at West End
|
North Somerset Flood Risk Mana… | 26 Apr 2016 | Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Nailsea Land at West End
Having looked at the site from an ordinary watercourse, surface water and ground water flooding point of view we have the following comments:
Drainage Category 2 - The site could be drained by sustainable drainage, however there are constraints and these need to be considered in the design
Reason – Groundwater Vulnerability, Susceptible to groundwater flooding
|