Site Allocations Plan March 2016
List Comments
3 comments.
Respondent | Response Date | Details |
---|---|---|
Environment Agency | 28 Apr 2016 | Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Infill Villages Stowell Concrete, Kenn
Tidal Flood Zone 3. FRA required with no development permitted within 20 metres of River Kenn. Contamination assessment required.
|
North Somerset Levels IDB | 28 Apr 2016 | Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Infill Villages Stowell Concrete, Kenn
NSLIDB see detailed comments
|
North Somerset Flood Risk Mana… | 26 Apr 2016 | Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Infill Villages Stowell Concrete, Kenn
Having looked at the site from an ordinary watercourse, surface water and ground water flooding point of view we have the following comments:
Drainage Category 2 - The site could be drained by sustainable drainage, however there are constraints and these need to be considered in the design
Reason - River Kenn on boundary - Significant constraints to infiltration, infiltration may be possible in northern part of the site.
|