Site Allocations Plan March 2016

List Comments

Search for Comments

Order By
in order

3 comments.

List of comments
RespondentResponse DateDetails
Environment Agency 28 Apr 2016

Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Infill Villages Stowell Concrete, Kenn

  • Comment ID: 1020673//33
Tidal Flood Zone 3. FRA required with no development permitted within 20 metres of River Kenn. Contamination assessment required.
North Somerset Levels IDB 28 Apr 2016

Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Infill Villages Stowell Concrete, Kenn

  • Comment ID: 11734177//75
NSLIDB see detailed comments
North Somerset Flood Risk Mana… 26 Apr 2016

Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Infill Villages Stowell Concrete, Kenn

  • Comment ID: 14550881//74
Having looked at the site from an ordinary watercourse, surface water and ground water flooding point of view we have the following comments: Drainage Category 2 - The site could be drained by sustainable drainage, however there are constraints and these need to be considered in the design Reason - River Kenn on boundary - Significant constraints to infiltration, infiltration may be possible in northern part of the site.